Hello 90’s!
This Production Log will surely take you back to the greatest decade ever. With less than a month away from my target date for production (Aug. 8th), I went out to obtain some of the props for the film. Very nostalgic experience taking this trip down memory lane. Everything is on track at this point as phone meetings commence this week with the talent and crew. I hope to accomplish all of our pre-production work by July 31st, so I have at least a week in August to fine tune all of the minor details. All that’s left is finishing the production book, reserving camera and equipment, purchasing the rest of the master prop list, and rehearsing. I am thankful that all of our locations are set and ready to go.
The next Log will be after our production so look forward to updated screen caps, pictures of the shoot and possibly video blogs.
“A lot of times you get credit for stuff in your movies you didn’t intend to be there”
– Spike Lee (Do The Right Thing, Malcolm X, Inside Man)